works for the motorway Salerno-Reggio Calabria (Italy) in conformity to CNR/80 rules type 1/b branch 1 - section 5 - lot 2
section n.1 from km 40+100 to km 44+100

 

WORK

Works for the motorway Salerno- Reggio Calabria in conformity to
CNR/80 rules type 1/B branch 1 – section 5 – lot 2. Section no. 1
from km. 44+100.

EMPLOYER

ANAS S.p.A.
National Authority for road maintenance / Motorway Salerno-Reggio
Calabria department.

AREA

Council Districts of Campagna, Contursi Terme e Postiglione (Salerno, Italy).

WORK DESCRIPTION

The length of the constructed section is 3400 mts with two side by side lanes.
The main part of the project is the Serra Lunga tunnel for a length of 1043 mts in the north lane and of 1008 mts in the south lane. The two tunnels are linked by a 45 mts long by-pass with a 8,50 mts cross section.