Tel Head Office: (+39) 0432 570571
Tel
Center of Operations: (+39) 0432 572185

Fax Head Office: (+39) 0432 571113
Fax
Purchase Department: (+39) 0432 688453

This email address is being protected from spambots. You need JavaScript enabled to view it.

NOTE! This site uses cookies and similar technologies.

If you not change browser settings, you agree to it. Learn more

I understand

 

 

works for the motorway Salerno-Reggio Calabria (Italy) in conformity to CNR/80 rules type 1/b branch 1 - section 5 - lot 2
section n.1 from km 40+100 to km 44+100

 

WORK

Works for the motorway Salerno- Reggio Calabria in conformity to
CNR/80 rules type 1/B branch 1 – section 5 – lot 2. Section no. 1
from km. 44+100.

EMPLOYER

ANAS S.p.A.
National Authority for road maintenance / Motorway Salerno-Reggio
Calabria department.

AREA

Council Districts of Campagna, Contursi Terme e Postiglione (Salerno, Italy).

WORK DESCRIPTION

The length of the constructed section is 3400 mts with two side by side lanes.
The main part of the project is the Serra Lunga tunnel for a length of 1043 mts in the north lane and of 1008 mts in the south lane. The two tunnels are linked by a 45 mts long by-pass with a 8,50 mts cross section.